TFUG consultation results

You may recall recently the consultation that took place for the piece of work AT/NZTA call Transport for Urban Growth (TFUG). Essentially over 2 Hamilton’s worth of people/homes are expected to be added to the fringes of Auckland in the North, North-west and South over the coming ~30 years.…
45 Comments

TFUG: North-west

The third and final consultation on Transport for Future Urban Growth (TFUG) has kicked off today and this time it’s the turn of the North-west. The intention of this work is to start working out what major transport infrastructure is going to be needed to support around 110,000 houses on undeveloped land in three main areas on the edge of Auckland. …
71 Comments

TFUG: North

Last week Auckland Transport and the NZTA kicked off consultation they call Transport for Future Urban Growth (TFUG). This is looking at what high level strategic transport networks may be needed over the next 30 years to support over two Hamilton’s worth of population outside the existing urban area – concentrated in three areas, North (including Warkworth), Northwest and South.…
20 Comments

Will the proposed Waitemata Harbour Crossing be good for drivers?

There are many reasons to be concerned about the plan to add more road lanes across Auckland’s Waitemata Harbour: from the extreme cost of building such big tunnels and interchanges [$5-$6 billion and four times as much as just building rail tunnels], to the undesirable flooding of city streets and North Shore local roads with even more cars, to the increase in air pollution and carbon emission this will create, the loss of valuable city land to expanded on and off ramps and parking structures, to the impact on the harbour of exhaust stacks and a supersized motorway on the Shore, to the pressure this will put on the rest of the motorway system particularly through the narrow throat of Spaghetti Junction.…
91 Comments

Future Urban Area Transport Networks

You may recall the Draft Future Urban Land Supply Strategy that the Council consulted on back in August which looked at the greenfield land that was to be released along with the costs of the infrastructure needed to service it. The outcome of the consultation is due soon however Auckland Transport’s presentation that I wrote about yesterday gives some more detail on the future transport networks needed for some of these major areas.…
44 Comments