ATAP ASAP’s – Eastern Busway
In Part 1 of my series I wrote about the third main between Westfield & Wiri as being an ATAP ASAP, a first decade project that in my opinion needed funding straight away. My second post of this series was about the need for extra trains prior to the completion of the City Rail Link.…
Improving EMU Travel Times – LGOIMA
Back in January I made a request to Auckland Transport asking what had been done/planned to improve travel times on the rail network, the response I received was very positive and if able to be implemented fantastic for rail users. You can view the entire response here.…
Third Main Business Case OIA
In November I made a request under the Official Information Act regarding any potential Third Main business case, as it was one of my ATAP ASAP’s and I wanted to know if any movement had been made, especially as it was mentioned in ATAP & the agencies had gone quiet on the issue.…
Sylvia Park Station Eastern/Carbine Rd Access LGOIMA
Back in September I wrote a post about Sylvia Park station, and how providing access to Carbine Road was a easy low hanging fruit to increase the catchment of our Rapid Transit Network, connecting people better to jobs in the Carbine Rd area, enabling the higher density residential development of the area in the Mixed Use and THAB zones, as well as significantly improving access to people studying at NZMA.…
Smaller Consultations – January
Recently I noticed that AT often do smaller online consultations all the time, as far as I know these are not shared widely. As a result I have decided to do a post every now and again on all the small consultations that are happening giving people the opportunity to share their thoughts with AT from Crossings to Bus Lanes to Parking, these are the recent ones
Central
Wynyard Quarter and Viaduct Harbour, Central Auckland – Speed Limit Change – (Closes 9.02.2017) Change the speed limit from 50 km/hr to 30 km/hr on the area known as the Wynyard Quarter and Viaduct Harbour, specifically on the roads shown on the attached drawing.…
Rapid Transit strengths
This is not a post about Busway’s vs Rail as modes, but a fun comparison of my experience on the Northern Busway to our Rail Network.
I recently went to the North Shore for an appointment where I had the pleasure of using the Northern Busway.…
RIP Eastern Motorway
In ATAP (the Auckland Transport Alignment Project) one of the ideas that was investigated was the reincarnation of the Eastern Motorway, this time called the Eastern Strategic Corridor. It came about as a result of a push by the NZCID (now just called Infrastructure New Zealand) in their report titled “Transport Solutions for a Growing City“.…
Great Cycling Myths & Mistakes – How Auckland can easily be a Great Cycling City
Recently I have been doing a lot of research on cycling, reading CROW – Design Manual for Bicycle Traffic, the NACTO Guides, and reading/watching some great content over by Mark Wagenbuur at Bicycle Dutch. People have always told me that the Dutch are the Holy Grail of Cycling, I had some knowledge of Dutch cycling, but it made sense for me to check it out more extensively.…
ATAP ASAP’s – Extra Trains
In Part 1 of my series I wrote about the Third Main between Westfield & Wiri as being an ATAP (Auckland Transport Alignment Project) ASAP, a first decade project that in my opinion needed funding straight away, my second post of this series is about the need for extra trains pre-CRL (City Rail Link).…
Driverless Light Rail
Many people comment to me how driverless technology will make transit obsolete, but I disagree, many of the advantages driverless cars have will apply to driverless transit too. Of course, we already have cities already have driverless transit by way of their metros and further, I’d argue that driverless technology will provide greater advantages to transit.…
Thank you for subscribing
Thanks for signing up for news from Greater Auckland! Keep an eye on your inbox for regular updates.
Processing...