The council is currently working through finalising the Auckland Plan which has sadly seen it change from being quite transformational in regards to development and transport to become more of the same. What’s worse is that in many ways is actually a backwards step as the split in spending between roads and public transport has actually shifted away from the 50:50 agreed to in the 30 year Regional Land Transport Strategy that was set a few years ago to now be 60:40 in favour of roads as pointed out here by Cr Wayne Walker when discussing the transport changes.
While the Auckland plan is the higher level document that will guide the city it doesn’t go into a lot of detail about many of projects or how to fund them and that’s where the long term plan comes in. The long term plan is a 10 year plan that lays exactly what projects will be done, how much they will cost and how they will be paid for so it is an incredibly important document, you can read all about the draft plan here. I mentioned the other day about how many of the numbers in the document simply don’t add up but there is far more to the plan than just that.
To give an overview of just how much money the council is planning to spend over the next 10 years they have split it up by capital expenditure or CAPEX (roads, libraries, parks and sports fields etc.) and operational expenditure or OPEX (day to day operations and services). They are planning to spend around $20 billion on CAPEX and $38 billion on OPEX and an over of this spending is below and as you can see transport is a fairly large chunk of each.
At a high level that when looking at OPEX, the split between PT and Roads is roughly even however when it comes to CAPEX, spending on roads being significantly more than what is proposed for PT at roughly 60/40 and as I’ll explain shortly there is potential for that PT spend to drop even further. The plan splits up transport spending into three areas, PT, roads and parking & enforcement.
PT
Here are a few stats about the PT network:
- 66.7 million passengers on public transport
- 97 km of rail routes
- 42 rail stations including the Britomart Centre, rolling stock of 19 motor units and 100 carriages,
- communications network (equipment and 66 kilometres fibre optic cable)
- 40 million bus service km per year
- 1,585 bus shelters, five busway stations (northern motorway)
- 66 on-road bus and transit (T2 & T3) lanes
- 27 Park ‘n Ride Sites
- 16 ferry terminals.
The plan proposes spending $4b (or 41% of capex) on PT over the next 10 years. The two biggest projects by far in this group both relate to rail with $534m allocated towards the purchase of our new EMUs and around $3b allocated to the City Rail Link. The council is currently working through what is needed for designation and will produce a new business case to properly address the issues raised in the governments review last year but what is key in this document is that the spending on the CRL is based on the assumption that the government will stump up with 50% or $1.2b of the construction and land costs. The problem however if the council can’t convince the government to invest in it they say they will put off looking at it till the next review of the LTP in 2015. In my view this kind of uncertainty doesn’t reflect the importance the council has placed on the project as it is listed as the number 1 project for the entire region for the next 30 years. Even more concerning is that if the government doesn’t agree to help fund it shifts the split of spending on roads vs PT from 60:40 down to about 85:15, hardly the transformational shift in spending the council likes to publicly claim.
When it comes to OPEX spending things are a little more even with roads however I do have a number of concerns. As mentioned the other day quite a few of the numbers in the document simply don’t make sense and this flows on to the costs of providing services. One thing that stands out to me is the expected cost per passenger km is expected to say exactly the same as it is now meaning there is no forecast for efficiency improvements in either the bus or rail networks. The forecast increases in costs are so bad the council is expecting them to almost double in the next 10 years while patronage is only expected to increase by about 30%. Here is the budget for PT spending:
If I’m correct and operating costs don’t increase that much then hopefully some of those budgeted funds can be used for PT infrastructure to improve efficiency.
Roads
- 7,900 km of roads of which 85 per cent are sealed, 15 per cent are unsealed (excluding 339km of state highways)
- 6,500 km of footpaths
- 94,000 streetlights illuminating urban roads, footpaths, car parks and transport facilities
- 368,000 vehicle crossings
- 1,300 million person trips made in private vehicles.
As mentioned there is about $5.6b budgeted to be spent on roads, some of the big projects named are AMETI for which a total of about $750m has been set aside in this plan (the current works are worth about $180m), sneaking in here even though it was hardly discussed at all in the Auckland Plan is Penlink at $110m. There is also a lot of local road upgrades included like $73m to upgrade Albany Highway and $69m for Dominion Rd. It is worth noting that while the title of the section also includes footpaths, there is only $390m to be spent on them, less than 7% of the total. Also to be fair I think it is worth pointing out that many of the projects in the roads space would potentially benefit public transport as well e.g. the Dominion Rd upgrade. Here is the budget for road spending:
I won’t really cover the parking section as there isn’t that much in it but one thing I did find interesting is just how little AT make from it. From what I can tell, after they take their costs out they are only making about $10-15m a year of parking and that is before CAPEX is considered.
Lastly there is quite a detailed breakdown of each CAPEX project included on this list. As this post is already quite long I will leave that for another day but there are certainly some interesting things in there.



Processing...
They purposefully charge too little for parking in the CBD to force the market down. The purpose of this subsidy is to ensure high utilisation and keep the CBD full of drivers, based on the idea that anything that gives people easier access to the CBD is a good thing.
Personally I think it’s a disaster, and there are a lot better ways to keep people shopping and working in town. If AT charged market rates they’d not only recover more funds from their assets, they’d stop holding down the private operators and subsidising parking/driving in general.
I was shocked to discover that the whole Victoria Quarter has street parking at $1 per hour right through the week, not to mention that they offer ‘earlybird’ parking at the downtown carpark if your in before 9.30am, and out by midnight. In what world is 9.30am an earlybird start? At $13 a day that’s only around $1.50 an hour for a working day.
I would have though by now we’re well beyond the idea that the vitality of the CBD depends on subsidising lots of cheap parking.
What’s truly weird is how this plan contradicts what’s in the Regional Land Transport Programme, which Auckland Transport released for consultation at exactly the same time. The RLTP says that there’s no more money to increase public transport OPEX over the next decade and the amount stays static. But this plan shows a huge increase in PT OPEX funding.
Which is true? Why aren’t they the same? Auckland Council seems like it’s proposing to give Auckland Transport money that Auckland Transport says it doesn’t need. How bizarre is that?
Hi Matt,
As always a really informative post. Two things stand out for me. Neither of the two docs you pasted into your post include a single ratio (as far as I can see) and you highlight this by saying,”The forecast increases in costs are so bad the council is expecting them to almost double in the next 10 years while patronage is only expected to increase by about 30%”. This is worrying as I have always thought this is the raison d’etre of governments & bureaucracies; their size and span of control enable them to deliver to the general population goods and services far more efficiently that we could source and deliver them to ourselves. So, if they are not showing on-going gains in these areas with all that capex spend they either don’t understand their role or know they can’t deliver on it so wont talk about it or do & should fold up their tent and hand the responsibility back to each of us.
Matt, this is a long way of asking if you or one of your team can build a picture of the growth in PT efficiencies in the last few years and separate out the efficiencies that has come from just an increase in the patronage versus efficiencies that have come directly as a result of capex spend. Or maybe you have already done that.
Cheers
Auckland Transport’s board reports, SOI and other measurements have indicated a reduction in subsidy per passenger kilometre over the last couple of years – which indicates some growing efficiency. As my earlier post noted, the RLTP doesn’t provide any more money over the next decade for PT services (bus, rail & ferry subsidies), whereas patronage is likely to continue to grow quite significantly.
That indicates there will need to be some massive efficiency gains. And don’t forget NZTA’s farebox recovery policy which necessitates the same thing.
I think it is a bit hard to tell what changes in subsidies have come from CAPEX vs increases in patronage as they often go hand in hand e.g. if you look at the western line the money spent to upgrade it has led to a lot more people using it. Whether or not services are more efficient to run out west compared to what it was before is a great unknown as AT don’t release data that granular.
Farebox recovery doesn’t come into effect fully until 2018 though. I’d be depressed if we still had a govt in charge that was determined to pursue it by then…
Other thoughts:
– Bloody Penlink, will that project NEVER die?
– Also, if you assume that the “East-West” highway which the Future Vision committee recently decided was Auckland’s number 2 transport priority (on the basis of no evidence that I’ve seen) is going to be included in the final version of this plan, along with AMETI, then the ratio of spend on roads to PT must be soaring upwards.
Yes good point about the east-west link. There is some money budgeted for upgrading Neilson St in the plan but nothing for that. So they would either have to add it to the list which would require spending to be increased, or a lot of smaller projects cut. Alternatively they might be expecting it to be a new state highway and the government pay fully for it.
Am I misreading something or does the PT opex table really say that in 2021 we’ll be spending $436 million on rail subsidies? Even if we’re somehow magically at 30 million rail trips a year by then, that’s double the per person subsidy we have now. I thought the point of electrification and integrated ticketing was to improve the efficiency of the rail network?
Again this is where I think their numbers are rubbish but also it is $436m on rail operating costs. That doesn’t take into account fares collected so that would take a little off the figure. Also what you can see is they have split up a whole heap of costs from a group called ‘Multi Modal” into rail but even in 2013 it doesn’t make much sense as my understanding is the rail network was currently costing about $80m-$100m to run.