There are some interesting bits and pieces in Auckland City Council’s recent Transport Committee meeting agenda. I moaned about the loss of the Tamaki Drive bus lane (and, more particularly $350,000 of precious public transport funding) the other day, which was debated at that meeting, but there is actually a bit more in relation to establishing “Managed Lanes” throughout Auckland City.

Now, it seems like a Managed Lane is one where council manages the types of vehicles or number of occupants in a vehicle that can use that particular lane. Bus lanes are the most obvious, but it also includes transit lanes (which allow cars with 2 or more occupants or sometimes 3 or more occupants in them) and freight lanes. Whilst I don’t support turning the Tamaki Drive bus lane into a Managed Lane, I certainly do support the establishment of Managed Lanes out of general traffic lanes. Increasing vehicle occupancy is certainly one way of increasing the capacity of a certain route without having to widen it for more cars. This certainly works for Onewa Road in North Shore City:

onewa Importantly, the Auckland City Council report says that Managed Lanes other than bus lanes are only likely to be viable in the long term on routes that do not have high-frequency bus services. Hopefully this means that they’re heading towards a situation where most if not all high-frequency bus routes have bus lanes along them. I’ve said a few times before that improving bus travel times is one of the best ways Auckland could improve its public transport system – and to do that it needs many many more bus lanes and smart-card ticketing.

But anyway, the introduction of Managed Lanes on currently congested roads I think is a good idea. Auckland City has proposed Neilson Street, Church Street, Patiki Road and parts of the Southeastern Highway as potentially suitable for having Managed Lanes – I think largely areas with high freight traffic and that feed into ramp signals with Managed Lane priorities already. At first look this is a bit of a disappointing list, but then that’s largely because it’s just Auckland City Council making these proposals. I think that having a T2 managed lane (a lane for vehicles with 2 or more occupants) on most of Auckland’s motorways would be a fantastic way to improve the people-moving capacity of these routes at peak hour. Off-peak, perhaps the T2 lane could become a freight only lane.

This is a step in the right direction generally – just as long as no more bus lanes are sacrificed! Auckland desperately needs more bus lanes, not less.

Share this

Leave a Reply

Your email address will not be published. Required fields are marked *